Elevator hall installation process standards
Aug 11, 2017

1 Scope The standard applies to the rated load of 5000kg and below, the rated speed of 3m / s and the various domestic

Traction drive elevator hall door installation works.

2 construction preparation

2.1 Equipment, material requirements:

2.1.1 hall parts should be consistent with the drawings, the number of complete.

2.1.2 dunk, door slide, hall doors should be no deformation, damage. Its various components should be completely lossless, functional and reliable.

2.1.3 production of steel legs and legs of the steel frame to meet the requirements.

2.1.4 welding electrodes and expansion bolts to have factory certificate.

2.1.5 cement, sand to comply with the provisions of Chapter II.

2.2 main equipment: bench drill, hammer, level, steel ruler, rectangular ruler, welding tools, gas welding tools, wire fall, oblique plug

Ruler, shovel, shovel, hammer, chisel.

2.3 Operating conditions:

2.3.1 Layers scaffolding bar position should not interfere with the installation of Hom Hom, hall door installation requirements.

2.3.2 The door and feet on the floor of the clean, no debris. Protection doors are safe and reliable. There are fire measures, set someone to see the fire.

3 operation process

3.1 process: stable to the gate → install the door column, the slide, the door set → installation hall door, adjust the hall door → lock, electric lock installation

3.2: stable to the ground:

3.2.1, according to the requirements of the model put two hall door installation of the baseline (high-level ladder is best to put three lines, the door of a line, the door on both sides of the two lines), in the hall door to draw the net door width line And the corresponding position marked with three lying on the basis of the baseline and this mark to determine the installation of the corner, legs and legs of the stent (Figure 5-53).

blob.png

3.2.2 If the ground corners of the legs for the concrete structure, rinse with water, the feet claw mounted on the ground.

And then cast with fine stone concrete (cement label is not less than 325 #. Cement, sand, stone volume ratio is 1:

2: 2). Steady to the ground when the leveling level leveling, while the three lying on the three corrections, and find a good distance from the line.

After cooking, the ground should be higher than the completion of the renovation of the ground 2 ~ 3mm, if the renovation of the ground for the concrete to the ground, it should be higher than 5 ~ 10mm, and should be 1:50 slope of the concrete floor and the ground plane smooth 5-54).

blob.png

3.2.3 If the lobby door does not have concrete legs, in the embedded iron brackets, the installation of steel legs to stabilize the ground, there are two cases:

3.2.3.1 Elevator rated load 1000kg and below the various elevators, can not be less than 65mm equilateral angle steel bracket, welding, and can be stable to Hom (Figure 5-55). The bracket is not less than 3.

blob.png

3.2.3.2 Elevator of the rated load of more than 1000kg of various types of elevators (not including 1000kg) can be used δ = 10 steel plate and channel steel legs made of brackets, welding, outside the stability of the Hom (Figure 5-56) cattle Leg bracket not less than 5.

blob.png

Figure 5-56

3.2.4 Elevator rated load of less than 1000kg (including 1000kg) of various types of elevators, if the hall gate at both the concrete legs and no pre-embedded iron, can be used M14 above the expansion bolts fixed cow legs bracket, (Figure 5-57).

blob.png

Figure 5-57

3.2.5 For high-rise elevators, the guide rails can be installed and adjusted in order to prevent errors caused by reference lines. And then to the car rail to determine the location of the ground installation. Methods as below:

3.2.5.1 in the center of the center M point 1 / 2L

M1 and M2 are marked (L is the car track spacing).

3.2.5.2 When installing the ground, the size of the front door side of the two doors measuring the door distance using a rectangular ruler is B + H-d / 2

(Usually 25mm or 30mm); width of the rail face. The width of the door is from the car center to the outside of the car;

3.2.5.3 Move the door to the bottom of M1, align the ruler of M2 and outer corner,

Set the OK (Figure 5-58). However, in order to check the center of the hall is correct, you can measure the distance between the center of the door and the two corners of the car. S1 and S2 should be equal (Figure 5-59).

3.3 installation of posts, slides, door sets

3.3.1 Cantilever concrete mounting column after the hard column. The brick wall is full of bolts (Figure 5-60).

blob.png

3.3.3 Concrete Structures If there is no pre-embedded iron, 150mm × 100mm × 10mm steel plates can be used as embedded in the corresponding position of the M12 expansion bolts (Figure 5-62).

blob.png

3.3.4 If the door slide, the door column from the wall more than 30 mm should be added to the ground ring fixed, if the gasket should be thicker at both ends of the thick pipe with welded iron plate method to ensure that its solid (Figure 5-63)

3.3.5 Measure the door runway level with horizontal scale. Such as the side of the open door, the two chute on the end of the surface should be agreed on the level, and use the line to check the upper and lower corners of the slope and the distance between the two parallel.

blob.png

blob.png

3.3.6 steel door sets to adjust the installation, with steel bars will be inside the door and the wall of steel reinforcement welding (Figure

5-64).

3.4 installation hall door, adjust the hall door:

3.4.1 Place the door guide and door pulley on the door leaf to set the eccentric wheel to the maximum (and the maximum distance from the slide). And then put the bottom of the guide foot into the bucket, the door wheel hanging on the slide.

3.4.2 A 6 mm thick support is placed between the door leaf and the ground. There is a special pad between the door pulley frame and the door leaf

And then adjust the connecting screws of the pulley frame and the door leaf, turn the eccentric wheel back to a distance of less than 0.5 mm from the chute, remove the pad between the door leaf and the ground, Glide test, to achieve light and easy to pass (Figure 5-65).

blob.png

Figure 5-65

3.5 lock, electric lock, safety switch installation:

3.5.1 should be installed before the lock hook, lock arm, roller, spring and so on to adjust, make it flexible and reliable.

3.5.2 Door lock and door safety switch to be installed according to the location specified in the drawings. If the installation of screw holes on the equipment does not meet the requirements of the drawings to be modified.

3.5.3 Adjust the door door lock and door safety switch to achieve: only when the two doors (or fan) closed to meet the requirements before the door electrical contacts and door safety switch connected.

Such as the door lock screw is adjustable, the door lock installation adjustment in place, you must add positioning screws to prevent the door shift.

3.5.4 When the car door and hall door linkage, the hook should be no hook and folder knife phenomenon, in the open door should run smoothly, no jitter and crash.

4 quality standards

4.1 The difference between the ground of the car and the distance between the gate and the gate is not more than mm. Test method: check the size.

4.2 Open the door knife and the floor of the door and the door to open the gate of the door and the car door to the gap between the clearance must be in the range of 5 ~ 8mm.

Test method: check the size.

4.3 The distance between the vertical side of the slide on the outside of the hall and the vertical plane of the inside of the tank shall be in accordance with the requirements of the drawings. The relative deviation of the measured ends of the upper and middle three points (1, 2, 3) ± 1mm. The parallelism between the slide and the ground should not be greater than 1mm. The lead-free a 'of the guide itself should be no more than 0.5 mm (Figure 5-66).

blob.png

Figure 5-66

Check the method: hanging line, the amount of inspection.

4.4 Hall fan vertical deviation of not more than 2mm, the door under the mouth clawing volume is not greater than 10mm, door round eccentric wheel door clearance is not greater than 0.5mm.

Check the method: hanging line, the amount of inspection.

4.5 door installation, adjustment should be achieved: the door flat, clean, no damage. Open and close light and smooth. In the sub-door closed when the upper and lower closed at the same time,

The door is consistent.

4.6 Hall frame frame of the vertical error and the slope of the level of the error should not exceed 1/1000.

Test method: to do the opening and closing observation.

4.7 Hall door closed, the lock should immediately lock the door, in order to make its action flexible, hook head 1mm activity (Figure 5-67), machine lock hook head locked in the hall outside, not the door Clawed. Test methods: scale and observation.

blob.png

4.8 door closed, door contact and contact must be better. Such as door lock screw hole adjustable, door installation adjustment, must be fixed with a fixed screw. Inspection methods: observation and inspection.

4.9 The clearance between the entrance door and the bottom is 6 ± 2mm. The distance between the door and the hall is 6 ± 2mm. Test Method: Check the size.

4.10 Tolerance items: The size requirements, allowable deviations and inspection methods for corridors and parking lots shall comply with the requirements of Table 5-10.

4.8 door closed, door contact and contact must be better. Such as door lock screw hole adjustable, door installation adjustment, must be fixed with a fixed screw. Inspection methods: observation and inspection.

4.9 The clearance between the entrance door and the bottom is 6 ± 2mm. The distance between the door and the hall is 6 ± 2mm. Test Method: Check the size.

4.10 Tolerance items: The size requirements, allowable deviations and inspection methods for corridors and parking lots shall comply with the requirements of Table 5-10.

6 should pay attention to quality problems

6.1 fixed steel door kit, to be welded to the door of the ribs, do not directly on the door cover welding.

6.2 All welding and expansion bolts must be securely fastened.

6.3 Where concrete parts are to be buried, it is necessary to carry out the inspection of the concealed works by the relevant departments in order to pour concrete.

6.4 If the parts of the hall are damaged or deformed, they should be repaired or replaced in time.